JP charges 18% of the construction cost. It is the only place JP earns on a cost-plus contract. Here is the maths, what is included, what is not and how to compare fees.

Gabriel Dutra Soares and Pedro Plutarcho Civil engineers and JP partners · CREA-CE 386564CE and CREA-CE 393625 Updated November 2026 · 5 min read
Short answer

JP charges 18% of the real construction cost. On a build costing R$ 1 million, that is R$ 180,000. It is the only place JP earns: there is no margin on materials or labour, because invoices are in your name and you see the price the supplier charged. The fee pays for the engineering office that manages the whole project. When a build needs an engineer of its own on site, that engineer goes into the construction cost.

That number is on the site on purpose. It is the first question in almost every meeting, and there is no sense in you spending an hour to find it out. The rest of this page shows the maths, what the fee covers and how to compare JP's fee with other builders'.

How the maths works

The fee is a percentage of the real cost: materials, labour and equipment. A few examples:

Real construction cost18% feeTotal
R$ 600,000R$ 108,000R$ 708,000
R$ 1,000,000R$ 180,000R$ 1,180,000
R$ 1,500,000R$ 270,000R$ 1,770,000

Because it is calculated on what the site actually spent, the fee follows the build. A purchase that comes in cheaper makes the build cheaper and the fee on it smaller.

What the 18% covers

The 18% pays for JP's engineering office, which manages the whole project and not only the site. That is where the planning, budgeting, purchasing and control engineers work, and where technical responsibility for the build comes from:

  • Planning the build and controlling the schedule.
  • A detailed budget before work starts.
  • Quoting, negotiating and managing purchases with suppliers.
  • Measuring what was done and quality control.
  • Technical responsibility registered at CREA-CE.
  • A photo site diary.
  • 24-hour cameras on site.
  • Tracking through Vobi.
  • A monthly statement of accounts.

What it does not cover

  • The construction cost itself, which is yours and invoiced in your name.
  • The site engineer, when the build needs an engineer of its own on site. That engineer goes into the construction cost.
  • The architectural and engineering designs, which are contracted separately.
  • Third-party services you hire separately, such as an interior designer or landscaper, when JP does not manage them.

What about the engineer on site?

Often the build has an engineer of its own, the site engineer, who is there every day. Whether one is needed depends on complexity and location: on a larger, more complex build or one far from Fortaleza, having someone dedicated to it is what keeps the pace and the quality. When that is the case, their salary goes into the construction cost, like the labour. This happens on several JP builds.

It is not charging twice for the same thing, because these are two different jobs. The site engineer looks after execution: working with the crew, checking the work and solving what comes up that day. The office, paid by the fee, looks after the whole project: it plans, budgets, quotes, buys, measures, controls quality and takes technical responsibility for the build. One does not replace the other.

When a build needs a site engineer, it shows in the budget before work starts and then in every monthly statement, with the amount in plain sight like any other cost.

A point worth making plainly

With a percentage fee, if the build costs more, the builder earns more. It is a real conflict of interest, and you should know about it before signing with any builder, JP included.

What protects you is the set of controls: the detailed budget made before starting, which says what the build should cost; the invoice in your name, which shows the real price; and the open sheet every month, where every increase needs an explanation and a receipt. Some builders work with a fixed fee in reais to take that incentive off the table. It is worth asking and comparing.

How to compare fees between builders

Two identical fees can cover very different things. Before comparing the number, compare what is inside it:

  • What the fee is calculated on: the total construction cost or only part of it?
  • What is in the fee and what is in the construction cost? The site engineer and the foreman can sit in either one, and both ways are legitimate. To compare proposals, add the fee to the cost of the team that manages the build, and check that all of it shows in the budget before work starts.
  • Is there a detailed budget before starting, or only a per-square-metre estimate?
  • How often does the statement come, and does it include a receipt for every purchase?
  • How many times a week does an engineer visit the site?

When the fee is very low

A fee well below the market usually means one of two things. Either the builder is earning somewhere you cannot see, normally a margin buried in material purchasing, or there will be no real engineer following the work. It is worth asking which one it is.

No builder works for free. If their earnings are not in the fee, they are somewhere else in your build.

Next step

Want to talk about your project?

Bring the land, the design or just the idea. The first conversation is there for us to say whether we can do what you want for what you have.