Where your money goes, stage by stage

Scroll and the house builds itself. Each stage shows how long it takes and how much of the budget it eats on a high-end house.

  1. Land and design
  2. Foundations
  3. Structure
  4. Masonry
  5. Services
  6. Finishes
  7. Handover

Land and design

Before anything else we read the land: topography, soil survey and what the city and the community allow you to build there. This is where the budget is born.

Time
4 to 8 wks
Of budget
6%

Foundations

Footings and ground beams sized by the soil survey, not by guesswork. Saving here is the most expensive mistake on a site, because it only shows up years later.

Time
3 to 5 wks
Of budget
8%

Structure

Columns, beams and slabs. This stage eats the most steel and concrete, so it is the most sensitive to material prices. When the dollar rises, it rises here first.

Time
8 to 12 wks
Of budget
18%

Masonry

The walls go up and the house finally has a shape. This is when the client visits and understands the size of each room. Moving a wall from here on costs money.

Time
6 to 9 wks
Of budget
10%

Services

Water, drainage, electrics, air conditioning and automation run inside the walls before plastering. Anything you forget to ask for now means breaking walls later.

Time
6 to 10 wks
Of budget
14%

Finishes

Flooring, window frames, joinery, fixtures, fittings and paint. The longest stage and the one that varies most in price, because this is where the standard you chose shows up.

Time
16 to 24 wks
Of budget
38%

Handover

Deep cleaning, service testing, the owner's manual and a walkthrough with you, item by item. The warranty starts the day the keys change hands.

Time
2 to 3 wks
Of budget
6%

Reference times and shares, based on high-end houses. Every project has its own curve.

The model

How JP charges

A cost-plus contract means the construction money is yours and stays yours. You pay the real cost, with invoices, and pay JP a fee to manage all of it.

Construction cost

Materials, labour and equipment at the price JP can buy them for. Invoiced in your name, with no margin buried inside.

+
Management fee
18%

On the construction cost. It is what JP earns, and the only place JP earns.

=
What you pay

A statement every month, with the open cost sheet and a receipt for every purchase.

Planning and scheduleDetailed budget before work startsQuoting and purchase managementMeasurement and quality controlRegistered technical responsibilityPhoto site diary24-hour cameras on siteTracking through VobiMonthly statement of accounts

The fee pays for JP's engineering office, which manages the whole project. When a build, because of its complexity or location, needs a site engineer of its own, their salary goes into the construction cost and shows in the budget.

Comparison

The same house, under both models

A house that costs R$ 1 million to build. Here is what you pay under each model.

Fixed price
Real construction costR$ 1.000.000
Risk margin and taxR$ 500 to 600k
You pay
R$ 1.5 to 1.6M

The builder takes the price risk and needs a margin for it, plus a higher tax burden. In exchange you buy certainty: the number is locked.

On the same house the gap runs from R$ 320k to R$ 420k. On cost-plus that gap stays with you. On a fixed price, it is what certainty costs.

Summary

The seven stages, in text

The same sequence above, to read slowly or print.

1

Land and design

Before anything else we read the land: topography, soil survey and what the city and the community allow you to build there. This is where the budget is born.

2

Foundations

Footings and ground beams sized by the soil survey, not by guesswork. Saving here is the most expensive mistake on a site, because it only shows up years later.

3

Structure

Columns, beams and slabs. This stage eats the most steel and concrete, so it is the most sensitive to material prices. When the dollar rises, it rises here first.

4

Masonry

The walls go up and the house finally has a shape. This is when the client visits and understands the size of each room. Moving a wall from here on costs money.

5

Services

Water, drainage, electrics, air conditioning and automation run inside the walls before plastering. Anything you forget to ask for now means breaking walls later.

6

Finishes

Flooring, window frames, joinery, fixtures, fittings and paint. The longest stage and the one that varies most in price, because this is where the standard you chose shows up.

7

Handover

Deep cleaning, service testing, the owner's manual and a walkthrough with you, item by item. The warranty starts the day the keys change hands.

Next step

Want to talk about your project?

Bring the land, the design or just the idea. The first conversation is there for us to say whether we can do what you want for what you have.