What it costs

The price, in the open, before the first meeting

Almost everyone who gets here wants the same thing. Instead of asking you to call, we write it down.

High-end two-storey house with a pool, cost-plus contract
R$ 5,318.59
per m², with designs, fees and JP's pay included, on a 255 m² house.

The CUB-CE R1-A index, for a high-standard house, closed September at R$ 3,546.10 per m², up 2.12% on the previous month. The real build sits about 50% above it, because the index leaves out foundations, the pool, designs, fees and the builder's pay.

See the full calculation
How much does it cost to build this house? In Portuguese.
In a minute and a half

How to get to the price per m²

Gabriel shows, on a 255 m² two-storey house, how to go from the CUB index to the cost of building a house like it. The video is in Portuguese, and the full calculation is written out below.

  1. Start with CUB R1-A, the basic cost of a high-standard house, published by Sinduscon-CE.
  2. Add what the CUB leaves out: pool, foundations, designs and fees, boundary wall and equipment.
  3. Add the builder's pay. At JP, 18% of the cost.
  4. Divide by the area and the months on site: that gives the price per m² and what the build needs each month.
More videos on Instagram
From the CUB to the price

The numbers for a 255 m² house, step by step

These are the numbers from the video, for a 255 m² two-storey house with a pool.

CUB R1-A, September 2026
R$ 3,546.10/m²

The basic cost of a high-standard house in Ceará, published every month by Sinduscon-CE. In September, up 2.12% on the previous month.

Construction cost
R$ 4,507.28/m²

The CUB plus what it leaves out: pool, foundations, designs and fees, boundary wall and equipment. On this house, R$ 245k.

What the CUB leaves out

PoolR$ 30k
FoundationsR$ 70k
Designs and feesR$ 50k
Boundary wallR$ 55k
EquipmentR$ 40k
Total outside the CUBR$ 245k

Boundary wall and equipment are estimates.

The build in numbers

Construction cost, R$ 4,507.28 × 255 m²R$ 1,149,355
JP's pay, 18%R$ 206,884
Total build costR$ 1,356,239
Standard schedule12 months
Average monthly spendR$ 113k a month

The monthly spend curve comes from a real JP build of 14 months, adjusted to 12. Every project has its own numbers: with your area, land and finishes, we redo this calculation for you.

The model

How JP charges

A cost-plus contract means the construction money is yours and stays yours. You pay the real cost, with invoices, and pay JP a fee to manage all of it.

Construction cost

Materials, labour and equipment at the price JP can buy them for. Invoiced in your name, with no margin buried inside.

+
Management fee
18%

On the construction cost. It is what JP earns, and the only place JP earns.

=
What you pay

A statement every month, with the open cost sheet and a receipt for every purchase.

Planning and scheduleDetailed budget before work startsQuoting and purchase managementMeasurement and quality controlRegistered technical responsibilityPhoto site diary24-hour cameras on siteTracking through VobiMonthly statement of accounts

The fee pays for JP's engineering office, which manages the whole project. When a build, because of its complexity or location, needs a site engineer of its own, their salary goes into the construction cost and shows in the budget.

Comparison

The same house, under both models

A house that costs R$ 1 million to build. Here is what you pay under each model.

Fixed price
Real construction costR$ 1.000.000
Risk margin and taxR$ 500 to 600k
You pay
R$ 1.5 to 1.6M

The builder takes the price risk and needs a margin for it, plus a higher tax burden. In exchange you buy certainty: the number is locked.

On the same house the gap runs from R$ 320k to R$ 420k. On cost-plus that gap stays with you. On a fixed price, it is what certainty costs.

What moves the price

Why two houses of the same size cost differently

Cost per square metre is a useful shortcut to start the conversation, nothing more. Five things explain almost all the difference between one budget and another.

The land

Topography, soil type and access change the foundations and earthworks before the house even starts to rise. Two neighbouring lots can have very different foundation costs.

The finish standard

This moves the total the most, because finishes are 38% of the budget. Local porcelain and imported stone do the same job at very different prices.

The shape of the house

A spread-out single-storey house has more foundation and more roof per m² than a two-storey. Facade detail, long spans and double-height spaces also load the structure.

Time

A stalled site costs money: site facilities, crew and equipment rental keep running. A slow decision on finishes becomes schedule, and schedule becomes cost.

The market

Steel, cement and copper follow the dollar and oil. The CUB-CE index publishes the monthly change in construction cost in Ceará, and is the public reference to check whether an increase makes sense.

Next step

Want an estimate for your project?

With the approximate area, number of floors and the city, we come back with an estimate. The detailed budget comes later, once the design is closed.