The price, in the open, before the first meeting
Almost everyone who gets here wants the same thing. Instead of asking you to call, we write it down.
The CUB-CE R1-A index, for a high-standard house, closed September at R$ 3,546.10 per m², up 2.12% on the previous month. The real build sits about 50% above it, because the index leaves out foundations, the pool, designs, fees and the builder's pay.
See the full calculationHow to get to the price per m²
Gabriel shows, on a 255 m² two-storey house, how to go from the CUB index to the cost of building a house like it. The video is in Portuguese, and the full calculation is written out below.
- Start with CUB R1-A, the basic cost of a high-standard house, published by Sinduscon-CE.
- Add what the CUB leaves out: pool, foundations, designs and fees, boundary wall and equipment.
- Add the builder's pay. At JP, 18% of the cost.
- Divide by the area and the months on site: that gives the price per m² and what the build needs each month.
The numbers for a 255 m² house, step by step
These are the numbers from the video, for a 255 m² two-storey house with a pool.
The basic cost of a high-standard house in Ceará, published every month by Sinduscon-CE. In September, up 2.12% on the previous month.
The CUB plus what it leaves out: pool, foundations, designs and fees, boundary wall and equipment. On this house, R$ 245k.
The 18% management fee on the cost. This is the real price per m², about 50% above the CUB.
What the CUB leaves out
Boundary wall and equipment are estimates.
The build in numbers
The monthly spend curve comes from a real JP build of 14 months, adjusted to 12. Every project has its own numbers: with your area, land and finishes, we redo this calculation for you.
How JP charges
A cost-plus contract means the construction money is yours and stays yours. You pay the real cost, with invoices, and pay JP a fee to manage all of it.
Materials, labour and equipment at the price JP can buy them for. Invoiced in your name, with no margin buried inside.
On the construction cost. It is what JP earns, and the only place JP earns.
A statement every month, with the open cost sheet and a receipt for every purchase.
The fee pays for JP's engineering office, which manages the whole project. When a build, because of its complexity or location, needs a site engineer of its own, their salary goes into the construction cost and shows in the budget.
The same house, under both models
A house that costs R$ 1 million to build. Here is what you pay under each model.
The money stays in your account. Every invoice is in your name and you see the cost sheet every month.
The builder takes the price risk and needs a margin for it, plus a higher tax burden. In exchange you buy certainty: the number is locked.
On the same house the gap runs from R$ 320k to R$ 420k. On cost-plus that gap stays with you. On a fixed price, it is what certainty costs.
Why two houses of the same size cost differently
Cost per square metre is a useful shortcut to start the conversation, nothing more. Five things explain almost all the difference between one budget and another.
The land
Topography, soil type and access change the foundations and earthworks before the house even starts to rise. Two neighbouring lots can have very different foundation costs.
The finish standard
This moves the total the most, because finishes are 38% of the budget. Local porcelain and imported stone do the same job at very different prices.
The shape of the house
A spread-out single-storey house has more foundation and more roof per m² than a two-storey. Facade detail, long spans and double-height spaces also load the structure.
Time
A stalled site costs money: site facilities, crew and equipment rental keep running. A slow decision on finishes becomes schedule, and schedule becomes cost.
The market
Steel, cement and copper follow the dollar and oil. The CUB-CE index publishes the monthly change in construction cost in Ceará, and is the public reference to check whether an increase makes sense.
More questions about cost
Want an estimate for your project?
With the approximate area, number of floors and the city, we come back with an estimate. The detailed budget comes later, once the design is closed.