What is a cost-plus construction contract and how does it work?
You pay the real cost of the build, invoiced in your name, plus a fee for the builder to manage it. Here is how the money moves each month, what the fee covers and who this contract suits best.


It is a contract in which you pay two separate things: the real cost of the build, invoiced in your name, and a fee for the builder to manage that cost. At JP the fee is 18%, and it is the only place JP earns. In exchange for open books, you accept that the final figure is estimated, not locked, on day one.
This page explains the two parts of the contract, how the money moves during the build, what you gain and what you accept, and the questions worth asking any builder who works this way.
The two parts of the contract
The first part is the real cost: everything the site consumes. Materials, labour, equipment, tool rental, skips. The builder negotiates and buys, but the invoice is in your name and the money leaves your account. There is no margin buried in the price of cement.
The second part is the management fee, a percentage of that cost. It pays for the builder's office, which manages the whole project: planning, budgeting, purchasing, control and technical responsibility for the build. On a house that costs R$ 1 million to build, the numbers look like this:
| Part | Amount |
|---|---|
| Real construction cost: materials, labour and equipment | R$ 1,000,000 |
| JP management fee, 18% | R$ 180,000 |
| You pay | R$ 1,180,000 |
Because the fee is calculated on the real cost, it follows what the site actually spent. If a purchase comes in cheaper than forecast, the saving is yours, and the fee on that purchase is smaller too.
How the money moves, month by month
- Before work starts, the builder delivers the detailed budget: how much of each material and each service the build will use, stage by stage. That is the ruler you measure everything against later.
- During the build, the builder quotes, negotiates and buys. The invoice is issued to your tax ID and the payment goes from your account straight to the supplier.
- The engineer measures what was done and records it in the site diary, with photos.
- Every month you get the statement: the sheet of what was spent, a receipt for every purchase and how far the work has advanced.
In practice, if the build is 40% done, you have paid close to 40% of the budget, and you can check it line by line. When those two numbers drift apart, it is time to ask why.
What the fee covers
At JP, the 18% pays for the engineering office, which manages the whole project and not only the site:
- Planning the build and controlling the schedule.
- A detailed budget before work starts.
- Quoting, negotiating and managing purchases with suppliers.
- Measuring what was done and quality control.
- Technical responsibility registered at CREA-CE.
- A photo site diary.
- 24-hour cameras on site.
- Tracking through Vobi, where you follow progress from your phone.
- A monthly statement of accounts.
Depending on complexity and location, the build may also have a site engineer of its own, on site every day. This happens on several JP builds. When it does, their salary goes into the construction cost and shows in the budget and the monthly statement, like any other cost. The fee still pays for the office that plans, budgets, buys and controls the whole build.
What you gain
- You pay nobody a risk margin. On a fixed price the builder charges to carry the risk of costs going up; here that money stays with you.
- Any saving made on purchasing is yours.
- You see the real price of everything that goes into the build.
- You can adjust finishes during the build knowing exactly what each change costs.
What you accept
It is only fair to give the other side. On cost-plus, the final figure is not locked on day one: it is estimated in the detailed budget and confirmed as the work goes. If steel goes up halfway through, you pay for it. The CUB-CE index, published monthly by Sinduscon-CE, is the public reference to check whether a cost increase is in line with the market.
You also need to be present. Reading the statement and deciding on finishes in time are part of the deal. A choice that drags becomes schedule, and schedule becomes cost.
Who cost-plus suits best
It works best for someone who wants to pay the real cost and follow the build, has some cash headroom to absorb price changes and is building a house with a lot of made-to-measure finishing, where choices happen during the work.
It works less well for someone who needs an exact figure on day one, for a bank or a partner, or who has no time to follow the build. In those cases a fixed price may make more sense, and JP works with both models.
Questions to ask any cost-plus builder
- What is the fee, and what is it calculated on?
- Is the invoice in my name? Who pays the supplier?
- Is there a detailed budget before work starts?
- How often does the statement come, and what does it include?
- Who is the responsible engineer, and how often do they visit the site?
- How do I follow the build when I am not there?
If the answers come quickly and in writing, that is a good sign. If they are vague, cost-plus will give you the bill, but not the control.