Do I need an architectural design before asking for a quote?

No. An estimate only needs the area, number of floors and city. The budget that becomes a contract does need a design, and JP can do the architecture and engineering or work on top of what you already have.

Gabriel Dutra Soares and Pedro Plutarcho Civil engineers and JP partners · CREA-CE 386564CE and CREA-CE 393625 Updated November 2026 · 4 min read
Short answer

Not to get started. A first estimate only needs the approximate area, the number of floors, the city and whether you will use financing. The detailed budget, the one that becomes a contract, does need a design, and JP can do the architecture and engineering or work on top of the design you already have.

What confuses many people is that an estimate and a budget are different things, made at different moments for different purposes. This page explains the difference, the three situations where JP comes in and what to bring to the first conversation.

An estimate is not a budget

An estimate answers one question: can I afford this? It starts from the area, number of floors, city and finish standard, and gives back a range. It is for deciding whether to go on, not for signing a contract.

The detailed budget answers another: exactly how much will this build cost, and when does the money go out? It is produced from the designs, with the quantity of every material and service, stage by stage, and comes with the cash-flow schedule. It is what becomes the contract, what goes to the bank for a construction loan and what serves as the ruler for the monthly statement during the build.

The three situations where JP comes in

If all you have is the land, JP does the complete design: architecture, from preliminary study to construction drawings, interiors with layout, joinery, lighting and finishes, and the structural, electrical and plumbing designs coordinated in BIM, with registered liability for each and a single point of contact from start to finish.

If you already have architecture from another professional, JP develops the engineering designs on top of it: structural, electrical and plumbing, coordinated with the design you have.

If you have the designs and want to know what it costs to build, JP does the quantity take-off, the detailed budget by stage, the cash-flow schedule and the month-by-month disbursement curve, so you can plan your cash or compare builders' proposals.

Why architecture and engineering are worth doing together

When the architecture is drawn without engineering nearby, clashes show up late: the beam that runs through the middle of a window, the drain pipe that has to cross a beam, the ceiling height that does not work with the false ceiling and the air conditioning. Finding that in the design costs a drawing revision. Finding it on site costs demolition, rework and weeks of schedule.

With the designs coordinated in BIM, those clashes appear in the model, before the build. That is what prevents the beautiful design that does not fit the budget or does not work on site. It does not mean you have to do everything with JP. It means someone has to coordinate, and it is better done before the first day on site.

The land comes first

Before any design, it is worth reading the land: topography, soil survey and what the city and the community allow you to build there. This is where the budget is born, because two neighbouring plots can have very different foundation costs. On the house that builds itself on the How it works page, this stage takes 4 to 8 weeks.

What to bring to the first conversation

  • The approximate area you have in mind and the number of floors.
  • The city and, if there is one, the gated community.
  • The land documents and, if you have it, the topographic survey.
  • Whether you will finance the build.
  • Reference photos of the finishes you like.
  • The schedule you have in mind and the amount you want to invest.

That is enough for an estimate. The detailed budget comes later, once the design is closed.

The right order

  • Estimate, to see whether it fits your budget.
  • Reading the land, then design.
  • Detailed budget and schedule, from the closed design.
  • Contract and, if there is one, financing.
  • Construction.

Skipping a step does not save time. It only pushes the decision to a moment when it costs more.