Delivered · High-end residential
Ignez Fiúza House I
JP's first house in the Ignez Fiúza community: 233 m², 4 en-suite bedrooms and an outdoor kitchen. Built with our own capital and sold in June 2025.
The project
What was built
Built between September 2023 and December 2024, 15 months. The sale closed in June 2025, completing the full cycle from land to deed.
It opened the way for Ignez Fiúza House II, built in the same community to the same finish standard.
Data sheet
Built area233.00 m²
En-suite bedrooms4
LeisureOutdoor kitchen
Construction time15 months
PeriodSep/2023 to Dec/2024
StatusDelivered and sold in Jun/2025
Built byJP in-house engineering